Ivan
PS I asked for the CX4 to be added, as being a new type, the BB may provide a useful resource for UK builders

________
pot news
You're the third person who's mentioned that idea to me ..... hmmmm! I think you may have a pointIs there any way to pool resourses if there are several on the go at the same time?
You only got the plans on Saturday ... When's the first flight planned? Two or three months time?just as well I've already made one then
Thanks, the table will fit, but I don't think there is enough space to rig it. That means you need an CX4 sized space around the table (assuming fuz is on the table). That's a big area, must be at least double garage sizespotthehall wrote:Basically you need a construction table 12" long, 3" wide and approximately 3" high (to suit your own comfortable working height) with a steel angle to one side of the table.
The aircraft is assembled and rigged on this table - just as well I've already made one then