I own a French registered Robin ATL which has had four airworthiness reviews (for CDN/ARC issue/renewal)during my ownership. Until part M these reviews were done by my local GSAC surveyor who flew over from Lille every three years. Now under part M a UK CAMO with G & I can do the same airworthiness reviews. I have an ARC checklist of all the items that need to be done, and the review normally takes less than a mornings paperwork, with a short afternoon inspection of the aircraft.
So having looked at the CAA list of G&I organisations, I started to phone round to book my aeroplane in for its first UK ARC renewal. The response has quite frankly sickened me!! Eg: " We can't work on 'foreign' aircraft" "If you let us do an annual as well as the ARC review, we might get it back to you in a month. But it will cost around £2000" "We have to have all the documents and logbooks and check the records back to birth, and it will take at least a week and we work at £48 per hour"
"We don't have that aircraft on our approval but we can apply to the CAA and that will cost £500 plus our costs, and we don't know how long it will take" "We don't use type-specific maintenance programs here, you will have to get it checked out using LAMP"
I will probably fly over to Lille and get the French surveyor to renew my ARC at his usual fee of around 200 euros!
The CAA and most of the UK GA engineering organisations are quite simply using part M to print money, and the whole thing stinks
